Category: Utilitarian

  • Welcome Jordy

    Welcome Jordy

    Jordy is studying architectural drawing in Heusden-Zolder. As part of his studies, he has chosen to do his internship at STAUT architects. Besides architectural drawing, he also has several years of experience in construction.

  • Granted renovation of pavilions

    Granted renovation of pavilions

    GO! Flanders has decided to award the renovation project for SBSO Zonnebos in ‘s Gravenwezel to us. The project includes the renovation of four pavilions. We are greatly looking forward to this collaboration!

  • STAUT on ArchDaily

    STAUT on ArchDaily

    ArchDaily has included the Jan Frans Willem kindergarten and music academy of STAUT-Perifer on their platform. We are extremely proud that the project was selected. Link: https://www.archdaily.com/1011341/jan-frans-willems-kindergarden-and-music-academy-staut-architecten-plus-perifer?ad_source=search&ad_medium=projects_tab

  • Projects tour

    Projects tour

    STAUT on project tour. The entire team visited current sites and projects that were completed several years ago. It was an educational day and a nice reunion of satisfied clients.

  • WELL BUILDING STANDARD

    WELL BUILDING STANDARD

    STAUT participates in WELL Building Standard workshop. WELL is a performance standard for buildings aimed at improving the health and well-being of the people who live and work in those buildings. Developed by the International WELL Building Institute (IWBI), it takes a holistic approach to optimizing the impact of buildings on the health of their…

  • Article ‘Architectura’

    Article ‘Architectura’

    Publication of Amadys office furnishings: https://www.architectura.be/nl/nieuws/absorberende-baffles-optimaliseren-akoestisch-comfort-in-minimalistische-kantooromgeving-staut/

  • Formwork of the platform ready

    Formwork of the platform ready

    Contractor Brebuild has completed the complex formwork for the play platform in the Omnimundo school. The concrete will be poured soon. The concrete structure remains visible. We are curious about the end result within 28 days. The final surface area of the playground will increase by almost 30%.

  • Aperitivo time

    Aperitivo time

    It is not without reason that the Italians are proud of their aperitivo. The word is derived from the Latin ‘aperire’, which means to open. It therefore refers to opening the stomach for the next meal. Our client’s love for Italy translates not without reason into a nice and atmospheric bar where you can enjoy…

  • MSC Belgium phase two delivered

    MSC Belgium phase two delivered

    Phase two of the office expansion for MSC Belgium has been completed. The well-being of the staff is central to this office design. Classic office functions can be fulfilled flexibly according to the needs of the moment. STAUT is very happy with the positive feedback from the users.

  • Start building play platform

    Start building play platform

    The contractor Brebuild has started the construction of the play platform for the Omnimundo school. The existing playground was too small for the kindergarten and primary school. An additional raised play area will also serve as a canopy. This design assignment is for the Municipal Education of Antwerp.